Batavia - Wagner 138kV Line (J1401)

Batavia - Wagner 138kV Line is a 150.0 MW solar interconnection project in Branch County, Michigan with a current status of operational. It is proposed to connect at Batavia - Wagner 138kV Line.

150.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameBatavia - Wagner 138kV Line
Queue IDJ1401
Statusoperational
Source statusDone
Market
TechnologySolar
Capacity150.0 MW
StateMichigan
CountyBranch County
Point of interconnectionBatavia - Wagner 138kV Line
Requested (queue) date2019-04-29
Proposed in-service date2023-11-17
Operational date2023-11-17
Withdrawn date
Developer
Utility / transmission ownerMETC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.