Battery Addition (1461)

Battery Addition is a 1.5 MW gas interconnection project in Rockingham, New Hampshire with a current status of withdrawn. It is proposed to connect at 400 Gosling Road, Portsmouth, New Hampshire. The project will interconnect to the 115kV Bus 1 & 2 at Schiller Substation, directly adjacent to the project’s proposed location on the former coal storage space directly to the southeast of Schiller Substation..

1.5 MWCapacity
WithdrawnStatus
NHMarket
GasTechnology

Project facts

Canonical nameBattery Addition
Queue ID1461
Statuswithdrawn
Source statusW
MarketNH
TechnologyGas
Capacity1.5 MW
StateNew Hampshire
CountyRockingham
Point of interconnection400 Gosling Road, Portsmouth, New Hampshire. The project will interconnect to the 115kV Bus 1 & 2 at Schiller Substation, directly adjacent to the project’s proposed location on the former coal storage space directly to the southeast of Schiller Substation.
Requested (queue) date2023-10-18
Proposed in-service date2028-09-01
Operational date
Withdrawn date2025-10-11
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata