Battery Storage Addition (to QP1086) (1261)

Battery Storage Addition (to QP1086) is a 160.0 MW solar+battery interconnection project in Knox, Maine with a current status of active. It is proposed to connect at CMP 115kV line Section 80.

160.0 MWCapacity
ActiveStatus
MEMarket
Solar+BatteryTechnology

Project facts

Canonical nameBattery Storage Addition (to QP1086)
Queue ID1261
Statusactive
Source statusA
MarketME
TechnologySolar+Battery
Capacity160.0 MW
StateMaine
CountyKnox
Point of interconnectionCMP 115kV line Section 80
Requested (queue) date2022-05-17
Proposed in-service date2028-03-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata