Battery Storage Addition (to QP1086) (1261)
Battery Storage Addition (to QP1086) is a 160.0 MW solar+battery interconnection project in Knox, Maine with a current status of active. It is proposed to connect at CMP 115kV line Section 80.
160.0 MWCapacity
ActiveStatus
MEMarket
Solar+BatteryTechnology
Project facts
| Canonical name | Battery Storage Addition (to QP1086) |
|---|---|
| Queue ID | 1261 |
| Status | active |
| Source status | A |
| Market | ME |
| Technology | Solar+Battery |
| Capacity | 160.0 MW |
| State | Maine |
| County | Knox |
| Point of interconnection | CMP 115kV line Section 80 |
| Requested (queue) date | 2022-05-17 |
| Proposed in-service date | 2028-03-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata