Battery Storage CNR only (1237)

Battery Storage CNR only is a 205.0 MW battery interconnection project in Washinton, Rhode Island with a current status of withdrawn. It is proposed to connect at Primary - NEP L190-2, Alt NEP G185S.

205.0 MWCapacity
WithdrawnStatus
RIMarket
BatteryTechnology

Project facts

Canonical nameBattery Storage CNR only
Queue ID1237
Statuswithdrawn
Source statusW
MarketRI
TechnologyBattery
Capacity205.0 MW
StateRhode Island
CountyWashinton
Point of interconnectionPrimary - NEP L190-2, Alt NEP G185S
Requested (queue) date2022-03-21
Proposed in-service date2029-12-07
Operational date
Withdrawn date2025-10-10
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata