Battery Storage CNR only (1237)
Battery Storage CNR only is a 205.0 MW battery interconnection project in Washinton, Rhode Island with a current status of withdrawn. It is proposed to connect at Primary - NEP L190-2, Alt NEP G185S.
205.0 MWCapacity
WithdrawnStatus
RIMarket
BatteryTechnology
Project facts
| Canonical name | Battery Storage CNR only |
|---|---|
| Queue ID | 1237 |
| Status | withdrawn |
| Source status | W |
| Market | RI |
| Technology | Battery |
| Capacity | 205.0 MW |
| State | Rhode Island |
| County | Washinton |
| Point of interconnection | Primary - NEP L190-2, Alt NEP G185S |
| Requested (queue) date | 2022-03-21 |
| Proposed in-service date | 2029-12-07 |
| Operational date | — |
| Withdrawn date | 2025-10-10 |
| Developer | — |
| Utility / transmission owner | ISO-NE |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata