Battery Storage is a 112.2 MW battery interconnection project in Penobscot, Maine with a current status of withdrawn. It is proposed to connect at EMERA Keene Rd 115 kV substation.

112.2 MWCapacity
WithdrawnStatus
BHEMarket
BatteryTechnology

Project facts

Canonical nameBattery Storage
Queue ID1014
Statuswithdrawn
Source statusW
MarketBHE
TechnologyBattery
Capacity112.2 MW
StateMaine
CountyPenobscot
Point of interconnectionEMERA Keene Rd 115 kV substation
Requested (queue) date2020-04-22
Proposed in-service date2024-06-01
Operational date
Withdrawn date2023-08-22
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata