Battery Storage (1122)

Battery Storage is a 20.0 MW battery interconnection project in Addison, Vermont with a current status of withdrawn. It is proposed to connect at VELCO Middlebury Substation @ 46kV bus.

20.0 MWCapacity
WithdrawnStatus
VTMarket
BatteryTechnology

Project facts

Canonical nameBattery Storage
Queue ID1122
Statuswithdrawn
Source statusW
MarketVT
TechnologyBattery
Capacity20.0 MW
StateVermont
CountyAddison
Point of interconnectionVELCO Middlebury Substation @ 46kV bus
Requested (queue) date2021-04-19
Proposed in-service date2022-12-31
Operational date
Withdrawn date2021-06-16
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata