Battery Storage (1232)

Battery Storage is a 27.4 MW battery interconnection project in Providence, Rhode Island with a current status of withdrawn. It is proposed to connect at NEC 115/34.5kV Iron Mine Hill Substation #1203 spare buss position #2.

27.4 MWCapacity
WithdrawnStatus
RIMarket
BatteryTechnology

Project facts

Canonical nameBattery Storage
Queue ID1232
Statuswithdrawn
Source statusW
MarketRI
TechnologyBattery
Capacity27.4 MW
StateRhode Island
CountyProvidence
Point of interconnectionNEC 115/34.5kV Iron Mine Hill Substation #1203 spare buss position #2
Requested (queue) date2022-03-04
Proposed in-service date2025-12-31
Operational date
Withdrawn date2024-10-23
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.