Battery Storage (1240)

Battery Storage is a 62.8 MW battery interconnection project in Kent, Rhode Island with a current status of withdrawn. It is proposed to connect at National Grid Kent County Substation - 115kV open line position between 4T3T and 3T10 breakers..

62.8 MWCapacity
WithdrawnStatus
RIMarket
BatteryTechnology

Project facts

Canonical nameBattery Storage
Queue ID1240
Statuswithdrawn
Source statusW
MarketRI
TechnologyBattery
Capacity62.8 MW
StateRhode Island
CountyKent
Point of interconnectionNational Grid Kent County Substation - 115kV open line position between 4T3T and 3T10 breakers.
Requested (queue) date2022-03-25
Proposed in-service date2025-12-31
Operational date
Withdrawn date2024-10-23
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.