Battery Storage (1324)

Battery Storage is a 55.0 MW battery interconnection project in Providence, Rhode Island with a current status of withdrawn. It is proposed to connect at 115 kV Line T-172N approximately 1.38 mi from Farnum Pike and 1.09 mi from Putnam Pike Substations.

55.0 MWCapacity
WithdrawnStatus
RIMarket
BatteryTechnology

Project facts

Canonical nameBattery Storage
Queue ID1324
Statuswithdrawn
Source statusW
MarketRI
TechnologyBattery
Capacity55.0 MW
StateRhode Island
CountyProvidence
Point of interconnection115 kV Line T-172N approximately 1.38 mi from Farnum Pike and 1.09 mi from Putnam Pike Substations
Requested (queue) date2022-10-18
Proposed in-service date2027-12-30
Operational date
Withdrawn date2024-10-23
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata