Battery Storage (1364)
Battery Storage is a 401.7 MW battery interconnection project in Rockingham, New Hampshire with a current status of withdrawn. It is proposed to connect at Timber Swamp Rd 345 kV station.
401.7 MWCapacity
WithdrawnStatus
NHMarket
BatteryTechnology
Project facts
| Canonical name | Battery Storage |
|---|---|
| Queue ID | 1364 |
| Status | withdrawn |
| Source status | W |
| Market | NH |
| Technology | Battery |
| Capacity | 401.7 MW |
| State | New Hampshire |
| County | Rockingham |
| Point of interconnection | Timber Swamp Rd 345 kV station |
| Requested (queue) date | 2023-03-01 |
| Proposed in-service date | 2026-11-20 |
| Operational date | — |
| Withdrawn date | 2025-01-13 |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata