Battery Storage (1374)

Battery Storage is a 226.0 MW battery interconnection project in Merrimack, New Hampshire with a current status of withdrawn. It is proposed to connect at Eversource 115 kV Line C196..

226.0 MWCapacity
WithdrawnStatus
NHMarket
BatteryTechnology

Project facts

Canonical nameBattery Storage
Queue ID1374
Statuswithdrawn
Source statusW
MarketNH
TechnologyBattery
Capacity226.0 MW
StateNew Hampshire
CountyMerrimack
Point of interconnectionEversource 115 kV Line C196.
Requested (queue) date2023-03-28
Proposed in-service date2027-04-07
Operational date
Withdrawn date2025-10-11
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.