Battery Storage (1418)

Battery Storage is a 108.7 MW battery interconnection project in Providence, Rhode Island with a current status of withdrawn. It is proposed to connect at 115KV Line Q143S-2 between Woonsocket and Franklin Square substations, approximately 10 miles from Woonsocket substation..

108.7 MWCapacity
WithdrawnStatus
RIMarket
BatteryTechnology

Project facts

Canonical nameBattery Storage
Queue ID1418
Statuswithdrawn
Source statusW
MarketRI
TechnologyBattery
Capacity108.7 MW
StateRhode Island
CountyProvidence
Point of interconnection115KV Line Q143S-2 between Woonsocket and Franklin Square substations, approximately 10 miles from Woonsocket substation.
Requested (queue) date2023-06-27
Proposed in-service date2027-04-01
Operational date
Withdrawn date2023-11-30
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata