Battery Storage (1443)
Battery Storage is a 200.0 MW battery interconnection project in Rockingham, New Hampshire with a current status of withdrawn. It is proposed to connect at Project will interconnect will be a shared facility at QP-1428's POI - via tap at existing 115 kV line between Eversource 115kV Scobie Pond - Pulpit Rock Line A184 115kV..
Project facts
| Canonical name | Battery Storage |
|---|---|
| Queue ID | 1443 |
| Status | withdrawn |
| Source status | W |
| Market | NH |
| Technology | Battery |
| Capacity | 200.0 MW |
| State | New Hampshire |
| County | Rockingham |
| Point of interconnection | Project will interconnect will be a shared facility at QP-1428's POI - via tap at existing 115 kV line between Eversource 115kV Scobie Pond - Pulpit Rock Line A184 115kV. |
| Requested (queue) date | 2023-09-20 |
| Proposed in-service date | 2026-12-30 |
| Operational date | — |
| Withdrawn date | 2023-11-20 |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.