Battery Storage is a 108.0 MW battery interconnection project in Providence, Rhode Island with a current status of withdrawn. It is proposed to connect at The Primary Point of Interconnection will be a direct interconnection to the 115-kV bus at Highland Park Substation owned by RI_NGRID. The Alternative Point of Interconnection will be located on the IC’s property (Lat, long: 41°59'46.60"N, 71°28'16.01"W) by tapping the 115-kV Line J16 (Riverside-Highland Park) at approx. 0.27 km from Highland Park Substation..
Project facts
| Canonical name | Battery Storage |
|---|---|
| Queue ID | 1472 |
| Status | withdrawn |
| Source status | W |
| Market | RI |
| Technology | Battery |
| Capacity | 108.0 MW |
| State | Rhode Island |
| County | Providence |
| Point of interconnection | The Primary Point of Interconnection will be a direct interconnection to the 115-kV bus at Highland Park Substation owned by RI_NGRID. The Alternative Point of Interconnection will be located on the IC’s property (Lat, long: 41°59'46.60"N, 71°28'16.01"W) by tapping the 115-kV Line J16 (Riverside-Highland Park) at approx. 0.27 km from Highland Park Substation. |
| Requested (queue) date | 2023-12-12 |
| Proposed in-service date | 2027-01-31 |
| Operational date | — |
| Withdrawn date | 2024-01-09 |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.