Battery Storage (1495)
Battery Storage is a 19.3 MW battery interconnection project in Windsor, Vermont with a current status of active. It is proposed to connect at Direct connection to VELCO 115kV Windsor substation (43.48988, -72.40858).
19.3 MWCapacity
ActiveStatus
VTMarket
BatteryTechnology
Project facts
| Canonical name | Battery Storage |
|---|---|
| Queue ID | 1495 |
| Status | active |
| Source status | A |
| Market | VT |
| Technology | Battery |
| Capacity | 19.3 MW |
| State | Vermont |
| County | Windsor |
| Point of interconnection | Direct connection to VELCO 115kV Windsor substation (43.48988, -72.40858) |
| Requested (queue) date | 2024-02-22 |
| Proposed in-service date | 2029-07-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata