Battery Storage (1502)

Battery Storage is a 19.3 MW battery interconnection project in Franklin, Vermont with a current status of active. It is proposed to connect at Direct connection to VELCO 115kV Highgate substation (44.943833, -73.058515).

19.3 MWCapacity
ActiveStatus
VTMarket
BatteryTechnology

Project facts

Canonical nameBattery Storage
Queue ID1502
Statusactive
Source statusA
MarketVT
TechnologyBattery
Capacity19.3 MW
StateVermont
CountyFranklin
Point of interconnectionDirect connection to VELCO 115kV Highgate substation (44.943833, -73.058515)
Requested (queue) date2024-03-28
Proposed in-service date2029-07-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata