Battery Storage (1564)

Battery Storage is a 101.0 MW battery interconnection project in Windham, Vermont with a current status of withdrawn. It is proposed to connect at Vernon 115 kV (Line K-40) Coordinates: 42.78270705350802, -72.51706642321578.

101.0 MWCapacity
WithdrawnStatus
VTMarket
BatteryTechnology

Project facts

Canonical nameBattery Storage
Queue ID1564
Statuswithdrawn
Source statusW
MarketVT
TechnologyBattery
Capacity101.0 MW
StateVermont
CountyWindham
Point of interconnectionVernon 115 kV (Line K-40) Coordinates: 42.78270705350802, -72.51706642321578
Requested (queue) date2024-06-06
Proposed in-service date2027-09-30
Operational date
Withdrawn date2025-10-06
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata