Battery Storage (1568)

Battery Storage is a 312.8 MW battery interconnection project in Washington, Rhode Island with a current status of withdrawn. It is proposed to connect at The Primary Point of Interconnection will be a direct interconnection to the 115-kV bus at Davisville Substation Expansion owned by RI_NGRID..

312.8 MWCapacity
WithdrawnStatus
RIMarket
BatteryTechnology

Project facts

Canonical nameBattery Storage
Queue ID1568
Statuswithdrawn
Source statusW
MarketRI
TechnologyBattery
Capacity312.8 MW
StateRhode Island
CountyWashington
Point of interconnectionThe Primary Point of Interconnection will be a direct interconnection to the 115-kV bus at Davisville Substation Expansion owned by RI_NGRID.
Requested (queue) date2024-06-12
Proposed in-service date2027-01-31
Operational date
Withdrawn date2025-10-10
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.