Battery Storage (872)

Battery Storage is a 180.0 MW battery interconnection project in Washington, Rhode Island with a current status of withdrawn. It is proposed to connect at National Grid 115kV Kent County- West Kingston line Approx: Latitude: 41°28'50.34"N, Longitude: 71°34'24.82"W.

180.0 MWCapacity
WithdrawnStatus
RIMarket
BatteryTechnology

Project facts

Canonical nameBattery Storage
Queue ID872
Statuswithdrawn
Source statusW
MarketRI
TechnologyBattery
Capacity180.0 MW
StateRhode Island
CountyWashington
Point of interconnectionNational Grid 115kV Kent County- West Kingston line Approx: Latitude: 41°28'50.34"N, Longitude: 71°34'24.82"W
Requested (queue) date2019-04-01
Proposed in-service date2023-03-01
Operational date
Withdrawn date2020-02-08
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata