Battery Storage (904)

Battery Storage is a 14.0 MW battery interconnection project in Kennebec, Maine with a current status of withdrawn. It is proposed to connect at CMP Puddledock substation, circuit 262D1.

14.0 MWCapacity
WithdrawnStatus
MEMarket
BatteryTechnology

Project facts

Canonical nameBattery Storage
Queue ID904
Statuswithdrawn
Source statusW
MarketME
TechnologyBattery
Capacity14.0 MW
StateMaine
CountyKennebec
Point of interconnectionCMP Puddledock substation, circuit 262D1
Requested (queue) date2019-08-01
Proposed in-service date2024-01-25
Operational date
Withdrawn date2025-01-08
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.