Battle Creek - Oneida 345kV Tap (J1322)

Battle Creek - Oneida 345kV Tap is a 200.0 MW solar interconnection project in Eaton County, Michigan with a current status of withdrawn. It is proposed to connect at Battle Creek - Oneida 345kV Tap.

200.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameBattle Creek - Oneida 345kV Tap
Queue IDJ1322
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity200.0 MW
StateMichigan
CountyEaton County
Point of interconnectionBattle Creek - Oneida 345kV Tap
Requested (queue) date2019-04-29
Proposed in-service date2022-04-20
Operational date2022-04-20
Withdrawn date2021-01-26
Developer
Utility / transmission ownerMETC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.