Battle Mountain Solar Project (61098_BMSP)

Battle Mountain Solar Project is a 101.0 MW solar interconnection project in Humboldt, Nevada with a current status of operational.

101.0 MWCapacity
OperationalStatus
NEVPMarket
SolarTechnology

Project facts

Canonical nameBattle Mountain Solar Project
Queue ID61098_BMSP
Statusoperational
Source status(OP) Operating
MarketNEVP
TechnologySolar
Capacity101.0 MW
StateNevada
CountyHumboldt
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2021-05-01
Withdrawn date—
Developer—
Utility / transmission ownerRWE Clean Energy

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata