Baxter Healthcare Aibonito CHP Plant (68024_CHP01)

Baxter Healthcare Aibonito CHP Plant is a 1.4 MW gas interconnection project with a current status of operational.

1.4 MWCapacity
OperationalStatus
—Market
GasTechnology

Project facts

Canonical nameBaxter Healthcare Aibonito CHP Plant
Queue ID68024_CHP01
Statusoperational
Source status(OP) Operating
Market—
TechnologyGas
Capacity1.4 MW
StatePR
CountyAibonito
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2023-07-01
Withdrawn date—
Developer—
Utility / transmission ownerBaxter Healthcare Corporation of Puerto Rico

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-11

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata