Baxter Wilson SES 115/500 kV Sw YD (J1130)

Baxter Wilson SES 115/500 kV Sw YD is a 966.0 MW gas interconnection project in Warren County, Mississippi with a current status of withdrawn. It is proposed to connect at Baxter Wilson SES 115/500 kV Sw YD.

966.0 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameBaxter Wilson SES 115/500 kV Sw YD
Queue IDJ1130
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyGas
Capacity966.0 MW
StateMississippi
CountyWarren County
Point of interconnectionBaxter Wilson SES 115/500 kV Sw YD
Requested (queue) date2018-03-12
Proposed in-service date2023-05-01
Operational date2023-05-01
Withdrawn date2019-08-29
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata