Bayonne Energy Center III (0815)

Bayonne Energy Center III is a 49.8 MW battery interconnection project in Kings, New York with a current status of active. It is proposed to connect at Gowanus 345kV.

49.8 MWCapacity
ActiveStatus
JMarket
BatteryTechnology

Project facts

Canonical nameBayonne Energy Center III
Queue ID0815
Statusactive
Source status12
MarketJ
TechnologyBattery
Capacity49.8 MW
StateNew York
CountyKings
Point of interconnectionGowanus 345kV
Requested (queue) date2019-04-05
Proposed in-service date
Operational date
Withdrawn date
DeveloperBayonne Energy Center LLC
Utility / transmission ownerCONED

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata