Bayou Cove to Richard 138kV (Circuit 258) (J1795)

Bayou Cove to Richard 138kV (Circuit 258) is a 100.0 MW solar interconnection project in Acadia, Louisiana with a current status of operational. It is proposed to connect at Bayou Cove to Richard 138kV (Circuit 258).

100.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameBayou Cove to Richard 138kV (Circuit 258)
Queue IDJ1795
Statusoperational
Source statusDone
Market
TechnologySolar
Capacity100.0 MW
StateLouisiana
CountyAcadia
Point of interconnectionBayou Cove to Richard 138kV (Circuit 258)
Requested (queue) date2020-06-22
Proposed in-service date2023-08-31
Operational date2023-08-31
Withdrawn date
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata