BCDC Transmission (0411)

BCDC Transmission is a 400.0 MW other interconnection project in Ny, New York with a current status of withdrawn. It is proposed to connect at NJ - Farragut Substation 345kV.

400.0 MWCapacity
WithdrawnStatus
JMarket
OtherTechnology

Project facts

Canonical nameBCDC Transmission
Queue ID0411
Statuswithdrawn
Source status0
MarketJ
TechnologyOther
Capacity400.0 MW
StateNew York
CountyNy
Point of interconnectionNJ - Farragut Substation 345kV
Requested (queue) date2013-07-01
Proposed in-service date2013-12-31
Operational date
Withdrawn date
DeveloperBCDC Transmission LLC
Utility / transmission ownerCONED

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata