Beaver Channel 161 kV Substation (J3153)

Beaver Channel 161 kV Substation is a 160.0 MW gas interconnection project in Clinton, Iowa with a current status of withdrawn. It is proposed to connect at Beaver Channel 161 kV Substation.

160.0 MWCapacity
WithdrawnStatus
—Market
GasTechnology

Project facts

Canonical nameBeaver Channel 161 kV Substation
Queue IDJ3153
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyGas
Capacity160.0 MW
StateIowa
CountyClinton
Point of interconnectionBeaver Channel 161 kV Substation
Requested (queue) date2022-09-15
Proposed in-service date2027-04-01
Operational date2027-04-01
Withdrawn date2026-10-20
Developer—
Utility / transmission ownerITC MIDWEST

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-11-05withdrawn_date—2026-10-20high
2026-11-05statusoperationalwithdrawnhigh
2026-10-31phasePhase 2Phase 3low
2026-10-14phasePhase 1Phase 2low
2026-07-29new_project—operationalhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata