Beaver County-Hitchland Dbl Ckt (Optima) 345kV (GEN-2014-037)

Beaver County-Hitchland Dbl Ckt (Optima) 345kV is a 200.0 MW wind interconnection project in Texas, Oklahoma with a current status of withdrawn. It is proposed to connect at Beaver County-Hitchland Dbl Ckt (Optima) 345kV.

200.0 MWCapacity
WithdrawnStatus
OKMarket
WindTechnology

Project facts

Canonical nameBeaver County-Hitchland Dbl Ckt (Optima) 345kV
Queue IDGEN-2014-037
Statuswithdrawn
Source statusWITHDRAWN
MarketOK
TechnologyWind
Capacity200.0 MW
StateOklahoma
CountyTexas
Point of interconnectionBeaver County-Hitchland Dbl Ckt (Optima) 345kV
Requested (queue) date2014-09-30
Proposed in-service date
Operational date
Withdrawn date2019-01-16
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.