Belle River - Fitz #2 345 kV Line Tap (J793)

Belle River - Fitz #2 345 kV Line Tap is a 1,175.0 MW gas interconnection project in St. Clair County, Michigan with a current status of operational. It is proposed to connect at Belle River - Fitz #2 345 kV Line Tap.

1,175.0 MWCapacity
OperationalStatus
Market
GasTechnology

Project facts

Canonical nameBelle River - Fitz #2 345 kV Line Tap
Queue IDJ793
Statusoperational
Source statusDone
Market
TechnologyGas
Capacity1,175.0 MW
StateMichigan
CountySt. Clair County
Point of interconnectionBelle River - Fitz #2 345 kV Line Tap
Requested (queue) date2017-06-16
Proposed in-service date2021-05-14
Operational date2021-05-14
Withdrawn date
Developer
Utility / transmission ownerITC MIDWEST

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata