Beloit 115 kV Substation (GEN-2024-072)

Beloit 115 kV Substation is a 160.0 MW solar interconnection project in Mitchell, Kansas with a current status of withdrawn. It is proposed to connect at Beloit 115 kV Substation.

160.0 MWCapacity
WithdrawnStatus
KSMarket
SolarTechnology

Project facts

Canonical nameBeloit 115 kV Substation
Queue IDGEN-2024-072
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologySolar
Capacity160.0 MW
StateKansas
CountyMitchell
Point of interconnectionBeloit 115 kV Substation
Requested (queue) date2024-10-30
Proposed in-service date2029-04-01
Operational date
Withdrawn date2026-05-21
Developer
Utility / transmission ownerSUNC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata