BELZONI - BELZONI TAP SS 115.0kV (J3590)

BELZONI - BELZONI TAP SS 115.0kV is a 75.0 MW solar interconnection project in Humphreys, Mississippi with a current status of operational. It is proposed to connect at BELZONI - BELZONI TAP SS 115.0kV.

75.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameBELZONI - BELZONI TAP SS 115.0kV
Queue IDJ3590
Statusoperational
Source statusActive
Market
TechnologySolar
Capacity75.0 MW
StateMississippi
CountyHumphreys
Point of interconnectionBELZONI - BELZONI TAP SS 115.0kV
Requested (queue) date2024-04-17
Proposed in-service date2028-12-31
Operational date2028-12-31
Withdrawn date
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.