Benton to Wolf Creek 345 kV Line (GEN-2020-086)

Benton to Wolf Creek 345 kV Line is a 500.0 MW solar interconnection project in El Dorado, Kansas with a current status of withdrawn. It is proposed to connect at Benton to Wolf Creek 345 kV Line.

500.0 MWCapacity
WithdrawnStatus
KSMarket
SolarTechnology

Project facts

Canonical nameBenton to Wolf Creek 345 kV Line
Queue IDGEN-2020-086
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologySolar
Capacity500.0 MW
StateKansas
CountyEl Dorado
Point of interconnectionBenton to Wolf Creek 345 kV Line
Requested (queue) date2020-04-23
Proposed in-service date2026-10-01
Operational date
Withdrawn date2024-03-11
Developer
Utility / transmission ownerWERE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata