Berlin Energy Uprate and Battery Addition (1103)

Berlin Energy Uprate and Battery Addition is a 15.0 MW battery interconnection project in Coos, New Hampshire with a current status of operational. It is proposed to connect at 22kV bus at Brookfield owned Goebel St Substation connected to the Eversource Berlin 115kV substation..

15.0 MWCapacity
OperationalStatus
NHMarket
BatteryTechnology

Project facts

Canonical nameBerlin Energy Uprate and Battery Addition
Queue ID1103
Statusoperational
Source statusC
MarketNH
TechnologyBattery
Capacity15.0 MW
StateNew Hampshire
CountyCoos
Point of interconnection22kV bus at Brookfield owned Goebel St Substation connected to the Eversource Berlin 115kV substation.
Requested (queue) date2021-03-10
Proposed in-service date
Operational date2023-12-19
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata