Berthold 115 kV Substation (GEN-2024-327)

Berthold 115 kV Substation is a 200.0 MW battery interconnection project in Ward, North Dakota with a current status of operational. It is proposed to connect at Berthold 115 kV Substation.

200.0 MWCapacity
OperationalStatus
NDMarket
BatteryTechnology

Project facts

Canonical nameBerthold 115 kV Substation
Queue IDGEN-2024-327
Statusoperational
Source statusDISIS STAGE
MarketND
TechnologyBattery
Capacity200.0 MW
StateNorth Dakota
CountyWard
Point of interconnectionBerthold 115 kV Substation
Requested (queue) date2025-03-01
Proposed in-service date—
Operational date2027-07-01
Withdrawn date—
Developer—
Utility / transmission ownerCPEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_project—operationalhigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata