Big Bear 345 Switching Station is a 250.0 MW wind interconnection project in Laramie County, Wyoming with a current status of active. It is proposed to connect at Big Bear 345 Switching Station.

250.0 MWCapacity
ActiveStatus
WYMarket
WindTechnology

Project facts

Canonical nameBig Bear 345 Switching Station
Queue IDGI-TC-2024-15
Statusactive
Source statusIA FULLY EXECUTED/ON SUSPENSION
MarketWY
TechnologyWind
Capacity250.0 MW
StateWyoming
CountyLaramie County
Point of interconnectionBig Bear 345 Switching Station
Requested (queue) date2024-05-23
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerTSGT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata