Big Horn 2 (G0224)

Big Horn 2 is a 50.0 MW wind interconnection project in Klickitat, Washington with a current status of operational. It is proposed to connect at Spring Creek 230 kv Sub.

50.0 MWCapacity
OperationalStatus
WAMarket
WindTechnology

Project facts

Canonical nameBig Horn 2
Queue IDG0224
Statusoperational
Source statusENERGIZED
MarketWA
TechnologyWind
Capacity50.0 MW
StateWashington
CountyKlickitat
Point of interconnectionSpring Creek 230 kv Sub
Requested (queue) date2006-05-09
Proposed in-service date
Operational date2007-06-01
Withdrawn date
DeveloperAvangrid Power, LLC
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata