Big Horn 2 (G0224)
Big Horn 2 is a 50.0 MW wind interconnection project in Klickitat, Washington with a current status of operational. It is proposed to connect at Spring Creek 230 kv Sub.
50.0 MWCapacity
OperationalStatus
WAMarket
WindTechnology
Project facts
| Canonical name | Big Horn 2 |
|---|---|
| Queue ID | G0224 |
| Status | operational |
| Source status | ENERGIZED |
| Market | WA |
| Technology | Wind |
| Capacity | 50.0 MW |
| State | Washington |
| County | Klickitat |
| Point of interconnection | Spring Creek 230 kv Sub |
| Requested (queue) date | 2006-05-09 |
| Proposed in-service date | — |
| Operational date | 2007-06-01 |
| Withdrawn date | — |
| Developer | Avangrid Power, LLC |
| Utility / transmission owner | Bonneville Power Administration |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata