Big Stone South 345 kV substation (J4240)

Big Stone South 345 kV substation is a 250.0 MW generation interconnection project with a current status of operational. It is proposed to connect at Big Stone South 345 kV substation.

250.0 MWCapacity
OperationalStatus
—Market
GenerationTechnology

Project facts

Canonical nameBig Stone South 345 kV substation
Queue IDJ4240
Statusoperational
Source statusActive
Market—
TechnologyGeneration
Capacity250.0 MW
State—
CountyGrant
Point of interconnectionBig Stone South 345 kV substation
Requested (queue) date2026-05-13
Proposed in-service date2031-06-28
Operational date2031-06-28
Withdrawn date—
Developer—
Utility / transmission ownerOtter Tail Power Company

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—operationalhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.