Big Timber Wind Farm (61155_BT-MT)

Big Timber Wind Farm is a 25.0 MW wind interconnection project in Sweet Grass, Montana with a current status of operational.

25.0 MWCapacity
OperationalStatus
NWMTMarket
WindTechnology

Project facts

Canonical nameBig Timber Wind Farm
Queue ID61155_BT-MT
Statusoperational
Source status(OP) Operating
MarketNWMT
TechnologyWind
Capacity25.0 MW
StateMontana
CountySweet Grass
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2018-02-01
Withdrawn date
Developer
Utility / transmission ownerRWE Clean Energy

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata