Bingham Wind CNR Only (755)
Bingham Wind CNR Only is a 184.8 MW wind interconnection project in Somerset, Maine with a current status of operational. It is proposed to connect at CMP 115kV Guilford Substation.
184.8 MWCapacity
OperationalStatus
MEMarket
WindTechnology
Project facts
| Canonical name | Bingham Wind CNR Only |
|---|---|
| Queue ID | 755 |
| Status | operational |
| Source status | C |
| Market | ME |
| Technology | Wind |
| Capacity | 184.8 MW |
| State | Maine |
| County | Somerset |
| Point of interconnection | CMP 115kV Guilford Substation |
| Requested (queue) date | 2018-04-25 |
| Proposed in-service date | — |
| Operational date | 2016-12-13 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | ISO-NE |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata