Biomass (126)

Biomass is a 40.0 MW other interconnection project in Cheshire, New Hampshire with a current status of withdrawn. It is proposed to connect at N-186, 115kV line between Vernon Road Tap and bor.

40.0 MWCapacity
WithdrawnStatus
NHMarket
OtherTechnology

Project facts

Canonical nameBiomass
Queue ID126
Statuswithdrawn
Source statusW
MarketNH
TechnologyOther
Capacity40.0 MW
StateNew Hampshire
CountyCheshire
Point of interconnectionN-186, 115kV line between Vernon Road Tap and bor
Requested (queue) date2004-11-09
Proposed in-service date2007-07-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata