Biomass Project (212)

Biomass Project is a 45.0 MW other interconnection project in Hillsborough, New Hampshire with a current status of withdrawn. It is proposed to connect at PSNH K-165 115 kV line.

45.0 MWCapacity
WithdrawnStatus
NHMarket
OtherTechnology

Project facts

Canonical nameBiomass Project
Queue ID212
Statuswithdrawn
Source statusW
MarketNH
TechnologyOther
Capacity45.0 MW
StateNew Hampshire
CountyHillsborough
Point of interconnectionPSNH K-165 115 kV line
Requested (queue) date2007-05-15
Proposed in-service date2010-02-28
Operational date
Withdrawn date2009-05-28
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata