Biomass Project (214)

Biomass Project is a 41.0 MW other interconnection project in Coos, New Hampshire with a current status of withdrawn. It is proposed to connect at PSNH 34.5 kV circuit from Lost Nation or Whitefiel.

41.0 MWCapacity
WithdrawnStatus
NHMarket
OtherTechnology

Project facts

Canonical nameBiomass Project
Queue ID214
Statuswithdrawn
Source statusW
MarketNH
TechnologyOther
Capacity41.0 MW
StateNew Hampshire
CountyCoos
Point of interconnectionPSNH 34.5 kV circuit from Lost Nation or Whitefiel
Requested (queue) date2007-05-21
Proposed in-service date2010-08-31
Operational date
Withdrawn date2007-10-27
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata