Bismark JCT 35 115 kV (GEN-2023-190)

Bismark JCT 35 115 kV is a 100.0 MW battery interconnection project in Douglas, Kansas with a current status of withdrawn. It is proposed to connect at Bismark JCT 35 115 kV.

100.0 MWCapacity
WithdrawnStatus
KSMarket
BatteryTechnology

Project facts

Canonical nameBismark JCT 35 115 kV
Queue IDGEN-2023-190
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologyBattery
Capacity100.0 MW
StateKansas
CountyDouglas
Point of interconnectionBismark JCT 35 115 kV
Requested (queue) date2023-10-02
Proposed in-service date2028-05-31
Operational date
Withdrawn date2023-11-14
Developer
Utility / transmission ownerEvergy

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.