Bison is a 100.0 MW wind interconnection project in Winnebago, Iowa with a current status of operational. It is proposed to connect at Bison.

100.0 MWCapacity
OperationalStatus
Market
WindTechnology

Project facts

Canonical nameBison
Queue IDJ3157
Statusoperational
Source statusActive
Market
TechnologyWind
Capacity100.0 MW
StateIowa
CountyWinnebago
Point of interconnectionBison
Requested (queue) date2022-09-15
Proposed in-service date2024-12-31
Operational date2024-12-31
Withdrawn date
Developer
Utility / transmission ownerITC MIDWEST

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.