Black Hills Energy (G61)
Black Hills Energy is a 55.0 MW gas interconnection project in Minidoka, Idaho with a current status of withdrawn. It is proposed to connect at Hay Mill 138 kV Substation.
55.0 MWCapacity
WithdrawnStatus
IDMarket
GasTechnology
Project facts
| Canonical name | Black Hills Energy |
|---|---|
| Queue ID | G61 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | ID |
| Technology | Gas |
| Capacity | 55.0 MW |
| State | Idaho |
| County | Minidoka |
| Point of interconnection | Hay Mill 138 kV Substation |
| Requested (queue) date | 2001-06-05 |
| Proposed in-service date | 2002-07-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Black Hills Energy Capital Inc |
| Utility / transmission owner | Bonneville Power Administration |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata