BLACKFOOT - MADRID 345.0kV (J2139)

BLACKFOOT - MADRID 345.0kV is a 250.0 MW solar interconnection project in Livingston, Michigan with a current status of operational. It is proposed to connect at BLACKFOOT - MADRID 345.0kV.

250.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameBLACKFOOT - MADRID 345.0kV
Queue IDJ2139
Statusoperational
Source statusActive
Market
TechnologySolar
Capacity250.0 MW
StateMichigan
CountyLivingston
Point of interconnectionBLACKFOOT - MADRID 345.0kV
Requested (queue) date2021-09-02
Proposed in-service date2024-09-01
Operational date2024-09-01
Withdrawn date
Developer
Utility / transmission ownerITC MIDWEST

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata