BLACKFOOT - MADRID 345.0kV (J3362)

BLACKFOOT - MADRID 345.0kV is a 300.0 MW battery interconnection project in Oakland, Michigan with a current status of withdrawn. It is proposed to connect at BLACKFOOT - MADRID 345.0kV.

300.0 MWCapacity
WithdrawnStatus
—Market
BatteryTechnology

Project facts

Canonical nameBLACKFOOT - MADRID 345.0kV
Queue IDJ3362
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyBattery
Capacity300.0 MW
StateMichigan
CountyOakland
Point of interconnectionBLACKFOOT - MADRID 345.0kV
Requested (queue) date2024-04-15
Proposed in-service date2028-09-01
Operational date2028-09-01
Withdrawn date2025-12-23
Developer—
Utility / transmission ownerITC MIDWEST

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-24phaseStudy Not StartedPhase 2low
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata