BLACKFOOT - MADRID 345.0kV (J3799)

BLACKFOOT - MADRID 345.0kV is a 1,452.0 MW gas interconnection project in Livingston, Michigan with a current status of operational. It is proposed to connect at BLACKFOOT - MADRID 345.0kV.

1,452.0 MWCapacity
OperationalStatus
Market
GasTechnology

Project facts

Canonical nameBLACKFOOT - MADRID 345.0kV
Queue IDJ3799
Statusoperational
Source statusPending Revision Approval
Market
TechnologyGas
Capacity1,452.0 MW
StateMichigan
CountyLivingston
Point of interconnectionBLACKFOOT - MADRID 345.0kV
Requested (queue) date2024-04-18
Proposed in-service date2030-04-01
Operational date2030-04-01
Withdrawn date
Developer
Utility / transmission ownerITC MIDWEST

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata