Blackhawk (MEC) - Quinn 345 kV (J2892)

Blackhawk (MEC) - Quinn 345 kV is a 200.0 MW wind interconnection project in Franklin, Iowa with a current status of withdrawn. It is proposed to connect at Blackhawk (MEC) - Quinn 345 kV.

200.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameBlackhawk (MEC) - Quinn 345 kV
Queue IDJ2892
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity200.0 MW
StateIowa
CountyFranklin
Point of interconnectionBlackhawk (MEC) - Quinn 345 kV
Requested (queue) date2022-09-15
Proposed in-service date2026-06-30
Operational date2026-06-30
Withdrawn date2025-09-11
Developer
Utility / transmission ownerITC MIDWEST

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata